Time to reach Min/Max EWT at max heat pump capacity

Discussion in 'Vertical and Horizontal Loops' started by cjfox, Jul 28, 2011.

  1. cjfox

    cjfox New Member

    Question: How long does it take a ground loop to reach its maximum or minimum design EWT when the heat pump is running at maximum capacity? I know the answer depends somewhat on the climate and time of year, but assume a typical residence in the Mid-Atlantic area near the end of the season.

    To put this question into its context, I am curious as to how to design a residential system. Do you design to the building loads, or to the installed heat pump capacity?

    Chris
     
  2. engineer

    engineer Well-Known Member Industry Professional Forum Leader

    Building load drives system tonnage which drives loop design.
     