Best Way to Pressure Test Loop?? Advice appreciated.

Discussion in 'General Discussions' started by saeheumsong, Jan 6, 2008.

  1. saeheumsong

    saeheumsong New Member

    Noble New Geothermal now Named GeoBattery

    I am very pleased to announce the completion of the noble geothermal system test.

    The noble new geothermal heat exchange system is now named as GeoBattery System followed by the role and shape of the heat exchanger. The name was provided by the workers to build test system in inventor's house.

    The inventor installed the system in his own house and proved commercial potential.

    This new system is compatible to any existing geothermal heat pumps both 'DX' and 'Water Source'.

    As previously reported,
    The system has the following characteristics.
    1. No drilling
    2. Near Zero Geothermal Looping
    3. Required land less than 200 sq for 4 tone system,
    may add 100 sq per additonal 2 tone capacity.
    4. Digging required 6-8 feet in U-Shape
    5. Immdeiate pay back with enjoyable profits.
    (cost less or similar to sum of air conditioner and heat furnace installation)
    5. Easy and fast to install
    6. Applicable to any size from small (town, apartment complex, condo) to bigger size (industrial, commercial).
    7. No gas emission (same to any geothermal)
    8. Similar or better efficiency compared to traditional geothermal system.

    Noble Geofurnace initiated installation of this system near NJ, NY and east PA area.

    for further inquiries, please contact
    SaeHeum Song, Ph.D.
    CEO, Noble Geofurnace Inc.
    225 Opossum Rd, Skillman, NJ, 08558
    E-mail: ssong@noblegeofurnace.com


    Experiences with Geothermal HeatPump,
    SaeHeum Song installed geothermal heat pump to replace electric radiator installed in 225 Opossum Rd. Electric bill reduction does not meet expectation. Installed geothermal system has defect in installation, in sufficient earth contact leading to the defect of the system. These opportunity leads to invention of the noble geothermal heat pump installation technology.
     
  2. Eric D

    Eric D Member

    Mr. Song,


    If you have a patent pending why the need for confidential agreement?


    How is the commercialization of your invention going?


    Regards,


    Eric D
     
  3. saeheumsong

    saeheumsong New Member

    Why do I want NDA on patent pending.

    This is because the textbook on patent instruct me to do so. In addition, this invention will target world wide patents not only USA.

    Patent panding may not apply to other countries.

    Thanks for asking

    SaeHeum Song
     
  4. Eric D

    Eric D Member

    Mr. Song,

    I am interest in your invention, but at this time I’m not interested in signing any type of confidential agreement. Without disclosing details, can you give some ideas as to where your invention is best suited? To clarify is it best for curtain locations like Northern, or Southern climates, soil types, etc.? How compact is the heat transfer area, what is the minimum ground area per ton?

    I would like to understand if this would allow dense populated areas to switch to geothermal, that currently have no option due to lack of ground area for a conventional design.

    Regards,

    Eric D
     
  5. saeheumsong

    saeheumsong New Member

    Send me E-mail please

    Dear Eric,

    Please send your contact info to my e-mail "saeheumsong@yahoo.com" then I will start to discuss the details with feasibility.

    Kind regards,
     
  6. saeheumsong

    saeheumsong New Member

    Success in noble Geothermal System,

    Hi Green Lovers through Geothermal Energy.

    I posted my patent pendig invention on NOBLE geothermal heat exchange method, not 'DX', not 'Water based'.

    I tested my system to my house since my previous Geothermal System had problem and succeeded in getting energy as I needed. Hence my new invention works.

    Now, I am looking for Partners/Investers to commercialize my this wonderful invention on Geothermal Energy Exchange System.

    Briefly, my noble invention has the following characteristics,

    Better to equal energy exchange efficiency compared to traditional Geothermal Heat Pump System.
    No Drilling need.
    No Large area requirement.
    Low cost of installation.


    In addition, If anyone interested in installing Geothermal Heat Pump with immediate payback (Cost installation is similar to or less then sum installing airconditioner and fire furnace), please discuss with me. ("saeheumsong@yahoo.com" and "stephan@agmgeothermal.com". We started installing Noble Geothermal Heat Pump in the area of NJ, PA and NY at this time.

    Thanks for the support.

    I am very happy to be able to announce the success in testing of this noble Geothermal heat Pump.

    SaeHeum Song, Ph.D
     
  7. @saeheumsong

    I merged your post from the GHPC board. Please do not repost your info.
     
  8. ViridianEnergy

    ViridianEnergy New Member

    We are a geothermal loop contractor in Ohio, and due to a recent manifold mishap on a loop hook-up (the HDPE manifold broke in half at some point during or shortly after back-fill), I'm questioning our pressure testing and back-filling operations. Would any fellow loop contractors care to share their procedures for A.) pressure testing procedures once a loop is fused together in the exterior (ie, PSI, and length of time), and B.) do you leave the system under pressure during backfill? C.) Further, what is acceptable pressure loss while testing, due to "pipe swell," and is leaving the exterior portion under 100 pounds overnight a "no, no?"

    Thanks in advance for any input. Both "book" answers and actual "field" practices would be interesting to hear about.
     
  9. gabby

    gabby Member Industry Professional Forum Leader

    Some people use a brass manifold, accessible from the ground (catch basin type of thing) removing the connections from harms way of back filling. Others run all loops inside to a manifold...again away from harm.

    There are those here that handle all aspects of loop fields...stay tuned to here from them.
     
  10. urthbuoy

    urthbuoy Well-Known Member Industry Professional Forum Leader

    I found a gas industry HDPE pressure testing operations manual at one point that had us re-think our pressure testing procedures. I'll see if I can find the relevant postings and be a bit more informative.
     
  11. urthbuoy

    urthbuoy Well-Known Member Industry Professional Forum Leader

    O.K. I couldn't find my exact source, but these all point to similar methodology:

    http://www.cpchem.com/hb/getdocanon.asp ... CPC-Portal

    http://www.fpua.com/files/DesignConstStand/SEC02620.pdf

    http://www.ejprescott.com/docs/TestingProcedures.pdf

    For us, it's water testing as much as possible. Often that isn't the answer on job sites, so we do occasionally top of with air. We pressurize to around 100psi (too much really but our CGC codes require 1hr at 100psi), re-check 20min later and record and top off, re-check 2-hours later (repeat), and then 4 hours later (4 hours total time that is). We do this when the pipe is daylighted. We then bleed the line back down to around 20psi before backfilling.

    I admit we have left pressurized lines overnight as sometimes we are near the end of a day when doing this. Though one shouldn't do this. We also use the old soapy water testing of all fittings. This just gives us instant feedback as we can usually get a quick read at around 30psi when the line is filling. Never had a leak show up later that didn't show up in the soapy bubble phase.
     
  12. waterpirate

    waterpirate Well-Known Member Industry Professional Forum Leader

    Hi and welcome,

    Was the manifold used made with butt fusion or socket fusion? What type of joint in the middle failed? Was the manifold purchased or made in house?
     